Waterproofing construction

Waterproofing is the process of applying specialized techniques and materials to prevent seepage of water, moisture or steam entering surfaces of construction, such as walls, foundations, floors, roofs and other surfaces. The waterproof helps protect the construction damage caused by water, minimizes the negative impact on the health of the user and increases the life of the construction.

The waterproof construction process begins with the analysis and evaluation of the conditions of the construction. The experts will then the waterproof methods and materials that suit the conditions of the construction, including the type of material, size, thickness, water resistance, adhesiveness and chemical resistance features.

After selecting the waterproof method and material, the worker will take surface preparation steps, including surface cleaning, surface standardization and surface drying. Then, the experts will perform the waterproofing process, including applying the airproof material to the surface using technologies such as scanning, spraying, mixing or sticking depending on the type of material.

H2 always strives to improve the quality of its products and services, while building a good and lasting relationship with customers. With the combination of experience, heart and professionalism, we are confident to provide our customers with the best products and services, meeting every customer's needs and requirements.

 H2 hopes to have the opportunity to cooperate and serve customers in the future

Workflow:

Step 1: Receive customer inquiries

Step 2: Survey the current status and check the design drawings

Step 3: Plan construction methods

Step 4: Control and respond to BOQ

Step 5: Negotiate to sign the contract

Step 6: Construction

Step 7: Acceptance, handover and liquidation of the contract

Leave a message

Send

And 3 most in the solution & Construction of Building floor system

#1 Expertise

Experienced in large projects of large corporations

#1 Solution

Utilize the latest industry solutions, knowledge and technologies

Created by potrace 1.16, written by Peter Selinger 2001-2019

#1 Process

Applying the quality management system according to ISO 9001:2015

500+

Employees

100+

Reference Projects

1

Experience in handling difficult projects
0.36319 sec| 1181.023 kb