Construction of plaster ceilings, painting and tiling

Plaster ceiling construction is the process of installing plaster ceilings on wooden or steel frames, and then carrying out repairs and sanding of ceiling surfaces to achieve a finished and beautiful ceiling surface. Construction of plasterboard ceilings includes the following steps: Installation of ceiling truss frame; Install gypsum board; Finishing the surface of the plasterboard ceiling; Paint baits; Paint the base coat; Paint finish; Painting: Surface preparation: clean the surface of walls, ceilings, floors and other surfaces to remove dust and stains. Apply the base coat: create a uniform base coat and increase adhesion to the paint finish.

Painting: Surface preparation: clean the surface of walls, ceilings, floors and other surfaces to remove dust and stains. Apply the base coat: create a uniform base coat and increase adhesion to the paint finish.

Paint finish: create the main coat and finish the surface, and create the color and gloss required by customers. 

Cladding: Surface preparation: create level and uniformity for the surface, and sanding to increase adhesion to the adhesive layer and tiles. Brick installation: installation of bricks to the surface at the same time keep an even distance between the bricks.

H2 always strives to improve the quality of its products and services, and build good and long-term relationships with customers. With a combination of experience, enthusiasm and professionalism, , we are confident to bring customers the best products and services, meeting all the needs and requirements of customers. H2 hopes to have the opportunity to cooperate and serve customers in the future

Workflow:

Step 1: Receive customer inquiries

Step 2: Survey the current status and check the design drawings

Step 3: Plan construction methods

Step 4: Control and respond to BOQ

Step 5: Negotiate to sign the contract

Step 6: Construction

Step 7: Acceptance, handover and liquidation of the contract

Leave a message

Send

And 3 most in the solution & Construction of Building floor system

#1 Expertise

Experienced in large projects of large corporations

#1 Solution

Utilize the latest industry solutions, knowledge and technologies

Created by potrace 1.16, written by Peter Selinger 2001-2019

#1 Process

Applying the quality management system according to ISO 9001:2015

500+

Employees

100+

Reference Projects

1

Experience in handling difficult projects
0.09089 sec| 957.898 kb